Mar 11, 2026  Jambo

Last updated on April 28, 2026

Jambo vs Tractivity: Stakeholder management software comparison

Jambo v Tractivity

 

Effective stakeholder engagement and consultation are essential for governments and organisations to maintain transparency, compliance, and accountability. As projects grow in complexity and the number of stakeholders increases, managing engagement data manually or with generic tools can be challenging. Risks associated with such approaches include regulatory non-compliance, stakeholder disengagement, and project delays.

Stakeholder management software is designed to help organisations and governments mitigate these risks by centralising data, documenting all interactions, issues, and commitments, and providing comprehensive reporting. These tools support teams in meeting regulatory requirements and fostering inclusive engagement processes, with clear audit trails that enable comprehensive documentation of stakeholder input.

What is stakeholder management software?

Stakeholder management software is specialised software for managing stakeholder interactions and consultation data. This article summarises the features and differences between two stakeholder management platforms: Jambo and Tractivity.

Jambo stakeholder management software

Jambo project dashboard

Jambo is an international stakeholder management software platform purpose-built for organisations and government teams focused on stakeholder and community engagement and consultation. It enables centralised management of stakeholder data, communication tracking, issue and commitment management, and regulatory compliance documentation. The platform offers:

  • Centralised contact and communication management
  • Project-based workspaces with extensive user permissions
  • Engagement tools, including a team planning calendar, campaigns, and secure AI
  • Issue and commitment tracking
  • Advanced analytics, custom dashboards, and pre-built and configurable reporting
  • Integrations with Microsoft Outlook, Esri ArcGIS Pro, Esri Maps, Zapier, and an API
  • Interface and features are built to WCAG 2.1 Level A standards (actively working towards the Level AA standard)
  • Available in English and French
  • ISO 27001 and ISO 27017 certifications; hosted on AWS in the desired data centre

Jambo operates globally with offices in Canada, Ireland, and Croatia. Data centres across multiple regions, including Canada, the US, Australia, and the EEA, are available to address data sovereignty considerations.

Tractivity stakeholder management software

Tractivity is a UK-based stakeholder management system. According to its website, it serves private- and public-sector organisations in the UK, Europe, and beyond, with listed customers including NHS Trusts, energy companies, UK transportation organisations, and UK educational institutions. The platform offers:

  • Centralised stakeholder database and mapping
  • Multi-project management with role-based access and permissions
  • Engagement tools, including surveys, email campaigns, and events
  • Feedback and issue management
  • Pre-built reports and built-in interactive dashboards
  • Integrations with Microsoft Outlook, Microsoft Teams, Power BI, Mapolitical, Google Maps, Office 365, Zapier, and an API
  • ISO 27001 and Cyber Essentials Plus accreditations; hosted on Microsoft Azure

Source: tractivity.co.uk/pricing; tractivity.co.uk/stakeholder-management-platform/a-few-of-the-benefits; tractivity.co.uk/stakeholder-management-platform/service-and-support; tractivity.co.uk/stakeholder-management-platform/security-and-compliance 

Overview of the differences between Jambo and Tractivity

1. User interface and accessibility

Jambo uses a project-based structure, with projects serving as workspaces that enable complete data segmentation by project, department, or division. User permissions are controlled at the project level, and reporting is project-based by default, with an option to report globally across the organisation or government department as needed. Jambo currently meets WCAG 2.1 Level A accessibility standards and is actively rolling out updates toward WCAG 2.2 Level AA compliance. All new features are built to the WCAG 2.2 Level AA standard from the outset. Jambo is mobile-responsive, meaning it is accessible on any device with an internet connection. 

Tractivity supports multi-project management with role-based access and permissions. The platform is cloud-based and accessible from any device with a modern web browser. Tractivity's website states that its interface meets WCAG 2.2 Level A accessibility standards and is mobile-responsive. It is worth noting that a platform-level WCAG claim does not necessarily mean every individual feature or module has been assessed against the standard.

Tractivity source: tractivity.co.uk/stakeholder-management-platform/security-and-compliance

2. Reporting and analytics

Jambo Insights provides advanced analytics that generate visualisations, including KPI trackers, pie charts, and bar charts. Users can combine these elements to create their own custom project dashboards and track team KPIs and project performance in real time. Jambo also offers a range of out-of-the-box reports, with the option to customise them to meet specific needs. Reports can be exported in Excel or PDF formats.

Tractivity offers 150+ configurable reports in PDF, Excel, and CSV formats, including qualitative, quantitative, and sentiment analysis. Built-in dashboards display KPI outputs and trends over time. Tractivity also offers a Microsoft Power BI integration for organisations that use Power BI for reporting, though this requires a separate Power BI licence and configuration outside the platform. Tractivity's website describes dashboards as built-in views of KPI data; it does not describe the ability for users to build fully custom dashboards from scratch using configurable widgets, as distinct from the platform's pre-built dashboard views.

Tractivity source: tractivity.co.uk/stakeholder-management-platform/a-few-of-the-benefits

3. Customisation and scalability

Jambo provides extensive configuration options, including custom fields, categories, tags, and dashboards. User roles include a contractor access role that limits users to adding their own data. Its project-based setup supports scaling from single projects to full organisational rollouts, with global and department-level overview options.

Tractivity supports multi-project management with role-based access. Tractivity's website does not provide details on creating custom fields, configuring user-created dashboards, or implementing tiered user roles beyond standard access controls.

Tractivity source: tractivity.co.uk/stakeholder-management-platform/a-few-of-the-benefits; tractivity.co.uk/stakeholder-management-platform/service-and-support

4. Support and customer success

Jambo's customer success team is made up of professionals with direct experience in stakeholder engagement, including staff with IAP2 certifications, the internationally recognised standard for public participation practitioners. This means Jambo's support team understands not just the software but also the discipline of stakeholder engagement. Jambo has both North American and European customer success team members, and support is available from 9am to 11pm UK time, covering both North American and UK time zones.

Tractivity provides dedicated UK-based account managers who can be contacted by telephone or email during UK business hours. Onboarding is conducted online, supported by monthly webinar sessions and an online knowledge base. Tractivity's website does not reference any stakeholder engagement sector qualifications or certifications held by its support team.

Tractivity source: tractivity.co.uk/stakeholder-management-platform/service-and-support

6. Global presence, data sovereignty, and localisation

Jambo has offices in Canada, Ireland, and Croatia, with customers in Canada, the US, the UK, Ireland, Australia, New Zealand, and the Middle East. Dedicated data centres are available in multiple regions, including a dedicated EEA data centre, enabling organisations to select the region that meets their regulatory and data sovereignty requirements. The platform is available in English and French, a documented requirement for Canadian federal and provincial government teams, and offers account-level localisation settings for setting the preferred currency, time zone, date display, and number format.

Tractivity is UK-based and describes itself as "the only fully UK-based stakeholder management platform." By default, all data is hosted in Tractivity's UK data centre. Clients with specific data sovereignty requirements can request an alternative hosting region, including the EEA or the United States. Tractivity does not list any non-UK offices. Tractivity's website states the platform is available in English and fully supports communication in Welsh, meeting the requirements of organisations operating under the Welsh Language Standards, a statutory requirement for many Welsh public sector bodies. Account-level localisation settings are available, though the website does not specify which settings are configurable. Tractivity does not reference French language support or localisation options beyond Welsh and English. It's also worth noting that Tractivity's data sovereignty options apply to data storage. As covered in the AI section below, AI processing via Azure OpenAI is not stated to be confined to a customer's chosen region.

Tractivity source: tractivity.co.uk

7. AI tools and data policy

Jambo offers a suite of purpose-built, secure AI tools. These include AI Sentiment Analysis, which automatically analyses the sentiment of stakeholder interactions, and AI Summarize, which generates clear summaries of communication records. Jambo also includes rules-based automation features, such as duplicate information detection and stakeholder creation when using the Outlook add-in. Jambo has an explicit, published AI policy that user data is never used to train AI models, an important consideration for organisations and governments handling sensitive consultation data. Jambo's Secure AI policy also goes a step further: AI tool usage is processed exclusively within your designated data centre region. For organisations that have selected a specific region for data sovereignty reasons, this means AI processing remains within that region. This is a meaningful distinction for government agencies and regulated organisations with strict data residency obligations that extend to AI processing, not just data storage.

Tractivity's website describes three features under the heading AI-Powered Stakeholder Management: stakeholder detection via its Outlook plug-in, duplicate record prevention, and survey response analysis. The first two, contact matching and duplicate flagging, are consistent with rules-based automation, a category of features that Jambo also provides. The third, survey response analysis, involves summarising and categorising text feedback, which Tractivity describes as AI-driven. Tratcit also states that they have AI Sentiment Analysis and AI Summarize tools. Tractivity's website states that all AI features run within its Microsoft Azure environment and that customer data is never used for model training or fine-tuning, with Azure OpenAI acting as a data processor on Tractivity's behalf. This is a meaningful commitment. However, processing via Azure OpenAI means that AI-related data leaves Tractivity's own infrastructure and is handled by a third-party processor. Tractivity's website does not state that AI processing is confined to a specific data centre region.

Tractivity source: tractivity.co.uk/stakeholder-management-platform/security-and-compliance

8. Security and compliance

Jambo holds ISO 27001 and ISO 27017 certifications. ISO 27017 is a cloud-specific security standard that provides additional controls for cloud service providers and customers. This certification is distinct from ISO 27001 alone and reflects a higher bar for cloud security governance. Jambo is hosted on AWS, which is SOC 2-compliant, and is monitored 24/7/365. Jambo's data centres across multiple regions support organisations and governments with specific data residency requirements, including a dedicated EEA data centre.

Tractivity holds ISO 27001 and Cyber Essentials Plus accreditations. Cyber Essentials Plus is a UK government-backed scheme focused on foundational cybersecurity hygiene. Tractivity is hosted on Microsoft Azure and is monitored 24/7/365 by a security operations team. Tractivity does not reference ISO 27017 certification, and its website does not provide information on data centre locations or data residency options.

Tractivity source: tractivity.co.uk/stakeholder-management-platform/a-few-of-the-benefits; tractivity.co.uk/stakeholder-management-platform/service-and-support

9. Pricing

The Jambo Professional subscription, which includes 5 users and 5 projects, starts at $995 per month. Enterprise pricing is available on request.

Tractivity publishes pricing on its website, with subscriptions starting from £9,495 per year. The platform leads with "unlimited user access" as a headline feature; however, the same pricing page states that the licence fee is based on the number of users and projects. Teams should request a detailed quote to understand exactly how costs scale with their user count and project volume before drawing comparisons on value.

Tractivity source: tractivity.co.uk

Jambo vs Tractivity comparison table

Feature/criteria

Jambo

Tractivity

User interface

Project-based data segmentation and reporting. Role-based permissions at the project level. Application and features are accessible to WCAG 2.1 Level A standard (self-assessed). Actively rolling out WCAG Level AA updates; all new features are built to the WCAG Level AA standard. Mobile-responsive. 

Multi-project management with role-based access and permissions. Cloud-based; accessible from any modern web browser. Interface is WCAG 2.2 Level A standard (self-assessed). Mobile-responsive.

Reporting and analytics

Jambo Insights: 250+ preset questions, user-created custom dashboards with configurable widgets, real-time KPI monitoring, line/bar/pie charts. Multiple export formats. Power BI-equivalent analytics built natively into the platform.

150+ configurable reports (PDF, Excel, CSV). Built-in KPI dashboards. Qualitative, quantitative, and sentiment analysis. Microsoft Power BI integration is available (requires a separate Power BI licence). The website does not describe user-created custom dashboards with configurable widget layouts.

Customisation and scalability

Custom fields, categories, tags, and custom dashboards. Multiple user roles, including a contractor access role. Scalable from single projects to full organisational rollout.

Role-based access and permissions across projects. Tractivity's website does not detail the creation of custom fields or tiered user roles beyond standard access controls.

Geographic presence

Global. Offices in Canada, Ireland, and Croatia. Customers in Canada, the US, the UK, Ireland, Australia, and New Zealand. Data centres in Canada, the US, Australia, and the EEA.

UK-based. Customers described as UK, Europe, and beyond. No non-UK offices listed. No information on data centre locations outside the UK.

Language support

English and French.

English and Welsh.

Integrations

Microsoft Outlook, Esri ArcGIS Pro, Esri Maps, Zapier. API available.

Microsoft Outlook (add-in), Microsoft Teams, Power BI, Mapolitical, Google Maps, Google Address Lookup, Office 365 email, Zapier. API available.

Data soverignty

Dedicated EEA data centre available. Data centre region selectable at account setup.

Default hosting in the UK data centre. Alternative regions, including EEA and the US, are available on request.  AI processing via Azure OpenAI, regional confinement of AI processing not stated.

Support and customer success

Customer success team with IAP2 certifications and stakeholder engagement backgrounds. North American and European account managers. Monthly webinars, online knowledge base, and helpdesk. Support available 9am–11pm UK time.

UK-based account managers are contactable during UK working hours. Online onboarding. Monthly webinar sessions and online knowledge base. No information on the support team's stakeholder engagement sector qualifications.

Security certifications

ISO 27001 and ISO 27017 certified. EU and UK GDPR-compliant.

ISO 27001 certified and Cyber Essentials Plus accredited. GDPR compliance management within the platform.

AI tools and policy 

Jambo Secure AI: AI Sentiment Analysis and AI Summarize. Rules-based automation: duplication detection, Outlook stakeholder creation. Published policy: user data never trains AI models. AI processing confined to your designated data centre region. AI tools are opt-in.

AI Sentiment Analysis and AI Summarise tools. Features also described as AI include stakeholder detection, duplicate record prevention, and survey response analysis. Published policy: data is never used for model training or fine-tuning; Azure OpenAI acts as a data processor. AI processing handled via Azure OpenAI means data leaves Tractivity's own infrastructure. No statement on the regional confinement of AI processing.

Pricing

Professional plan from $995/month (5 users, 5 projects). Enterprise pricing on request.

Subscriptions starting from £9,495 per year. The actual licence fee is based on the number of users and projects.

 

Key considerations when evaluating stakeholder management software

Both Jambo and Tractivity offer core stakeholder management capabilities, including stakeholder databases, engagement tracking, reporting, and project management. When evaluating the two platforms, teams may wish to consider the following:

  • Global operations and data residency: Jambo offers dedicated data centres in multiple regions (Canada, the US, Australia, and the EEA), selectable at account setup, with offices in Canada, Ireland, and Croatia. Tractivity defaults to UK hosting, offers alternative regions (including the EEA) on request, and has no non-UK offices. Organisations with data residency requirements that extend to AI processing should also note that Jambo confines AI processing to the customer's designated region; Tractivity does not make an equivalent commitment.
  • Multilingual requirements: Jambo is available in English and French. Tractivity is available in English and meets Welsh Language Standards requirements.
  • Specialist support: Jambo's customer success team includes IAP2-certified professionals with stakeholder engagement backgrounds. Tractivity's support team qualifications are not described on its website.
  • AI security and data governance: Jambo publishes an explicit policy that user data is not used to train AI models. Tractivity does not publish an equivalent policy.
  • Cloud security: Jambo holds ISO 27001 and ISO 27017 (a cloud-specific standard). Tractivity holds ISO 27001 and Cyber Essentials Plus.
  • Support hours: Jambo provides support from 9am to 11pm UK time. Tractivity's account managers are available only during UK business hours.
  • Accessibility: Jambo meets WCAG 2.1 Level A and is actively rolling out WCAG Level AA updates, with all new features built to the WCAG Level AA standard. Tractivity states that its interface complies with WCAG Level A. Teams with statutory accessibility obligations should verify the scope of each platform's compliance; a platform-level claim does not guarantee every module or feature has been individually assessed. 

Frequently Asked Questions (FAQs):
Jambo vs. Tractivity

Here, you can find answers to the most commonly asked questions about how Jambo compares to Tractivity.

If you don't find the answer you're looking for, our friendly sales team is always here to help. You can contact us at hello@jambo.cloud.

1. What are the main differences between Jambo and Tractivity?

Jambo is a global SRM platform with offices in Canada, Ireland, and Croatia, dedicated data centres in multiple regions, including the EEA, support available until 11pm UK time, and a customer success team with IAP2 certifications. Tractivity is UK-based, with UK-hours support and no published information on data centre locations, multilingual support, or AI data usage policies.

Tractivity sources: tractivity.co.uk; tractivity.co.uk/stakeholder-management-platform/service-and-support

2. What features does Jambo offer for stakeholder engagement and consultation?

Jambo includes communication logging with audit trails, issue and commitment tracking, configurable reporting, unlimited custom dashboards (via Jambo Insights), Jambo Secure AI tools, integrations with Outlook, Esri ArcGIS Pro, and Zapier, WCAG 2.1 Level A accessibility compliance, and an interface that can be used in English or French.

3. How do customer support and onboarding compare?

Jambo's customer success team includes IAP2-certified professionals with stakeholder engagement backgrounds, supported by North American and European account managers available until 11pm UK time. Tractivity provides UK-based account managers during UK business hours, online onboarding, and a self-serve knowledge base. Tractivity's website does not reference sector qualifications for its support team.

Tractivity source: tractivity.co.uk/stakeholder-management-platform/service-and-support

4. Which platform is more customisable?

Jambo offers custom fields, categories, tags, dashboards, and a contractor access role, plus account-level localisation for currency, time zone, and date format. Tractivity's website does not describe equivalent custom field configuration or localisation options.

Tractivity source: tractivity.co.uk/stakeholder-management-platform/a-few-of-the-benefits

5. Can these platforms be used outside the UK?

Jambo is built for global use, with offices across three countries, customers in seven, platform usage and support in English and French, and a dedicated EEA data centre. Tractivity is UK-based. Its website references English and Welsh language support, but does not mention French or other languages. Localisation options are referenced but not detailed. Tractivity does not list non-UK offices.

Tractivity source: tractivity.co.uk

6. How do the AI tools compare?

Jambo Secure AI includes named tools (AI Sentiment and AI Summarize), with a published policy stating that user data is never used to train AI models. Jambo's AI policy goes further: AI tool usage is processed exclusively within your designated data centre region, meaning organisations that have selected the EEA data centre, for example, can be assured that AI processing also stays within that region. For government agencies and regulated organisations with data residency obligations that extend beyond storage to active processing, this distinction is worth examining carefully. 

Tractivity labels several features as AI (contact matching, duplicate flagging) and also offers AI survey response analysis, AI Summarise and AI Sentiment Analysis. Tractivity processes AI features through Azure OpenAI, which acts as a data processor on its behalf, a meaningful commitment, though it means AI-related data leaves Tractivity's own infrastructure. 

Tractivity source: https://www.tractivity.co.uk/stakeholder-management-platform/security-and-compliance

7. How do the security certifications compare?

Jambo holds ISO 27001 and ISO 27017, the latter being a cloud-specific extension covering additional controls for cloud environments. Tractivity holds ISO 27001 and Cyber Essentials Plus, a UK government-backed foundational cybersecurity certification. Tractivity does not reference ISO 27017.

Tractivity source: tractivity.co.uk/stakeholder-management-platform/service-and-support

 

8. How does pricing compare?

Jambo's Professional plan starts at $995/month for 5 users and 5 projects, with Enterprise pricing available on request. 

Tractivity now publishes pricing on its website, with subscriptions starting from £9,495 per year. The platform describes itself as offering unlimited user access; however, its pricing page also states that the licence fee scales based on the number of users and projects.

Teams comparing both platforms should request a full breakdown from Tractivity, including how costs scale with user count and project volume, before drawing conclusions about value.

Tractivity source: tractivity.co.uk/pricing

9. Which platform suits larger, multi-departmental deployments?

Jambo's project-based architecture supports scaling from single projects to organisation-wide rollouts, with tiered user roles, a contractor access role, a cross-project global overview, and data segmentation by department or division. Tractivity supports multi-project management with role-based access, 150+ configurable reports, built-in KPI dashboards, and Power BI integration. Its website does not detail the cross-departmental reporting architecture or the creation of a fully user-configurable dashboard equivalent to Jambo Insights. 

Tractivity source: tractivity.co.uk/stakeholder-management-platform/a-few-of-the-benefits

10. What should organisations with data sovereignty requirements consider?

Jambo offers dedicated data centres across multiple regions (Canada, the US, Australia, and the EEA) and customers select their preferred region at account setup. This applies to both data storage and AI processing, which is confined to the customer's designated region. Tractivity hosts data in its UK data centre by default, with alternative regions including the EEA and the US available on request. However, Tractivity does not describe dedicated regional infrastructure outside the UK, and does not state that AI processing is confined to a customer's chosen region. Organisations with strict data residency obligations, particularly those covering active data processing as well as storage, should verify the scope of each platform's commitment in writing before purchasing. 

Tractivity source: tractivity.co.uk/stakeholder-management-platform/security-and-compliance 

11. Which platform meets government accessibility requirements?

Both platforms self-assess against WCAG standards. Tractivity's website states its interface meets WCAG 2.2 Level A. Jambo currently meets WCAG 2.2 Level A and is actively rolling out WCAG 2.2 Level AA updates, and all new features are built to WCAG 2.2 Level AA standard from the outset.

Neither platform holds a formal third-party WCAG certification. Teams with statutory accessibility obligations, including UK government agencies, NHS organisations, and local authorities, should request a detailed breakdown of which features and modules have been assessed against WCAG standards before purchasing. 

Published by Jambo March 11, 2026
Jambo

Related posts

Stakeholder relationship management - June 22, 2026
Best stakeholder reporting software for government and regulated industries
Chinenye Ozowara
Chinenye Ozowara Author at Jambo
Stakeholder engagement - June 15, 2026
The 5 best stakeholder management software
Chinenye Ozowara
Chinenye Ozowara Author at Jambo
Stakeholder engagement - June 08, 2026
Dynamics CRM vs a stakeholder CRM: what's the difference?
Chinenye Ozowara
Chinenye Ozowara Author at Jambo